New Home Electrical Wiring, From Plans to Handover
Plan review · rough-in · fit-off · Certificate of Electrical Safety
New homes are where Teksol started. We wire new builds for builders and owners across Point Cook, Tarneit, Truganina and Werribee, from the first plan review to the final test, turning up on time at every stage so the build keeps moving.
- 5.0 Google rating
- 10 yearsWiring Wyndham since 2016
- Locked-inWritten, fixed quotes



- Locked-in quotesWritten, itemised price that only changes if the job does
- On time, every timeWe arrive when we say, or we call ahead
- Licensed and insuredRegistered Electrical Contractor, REC 26543
- Tested and certifiedCertificate of Electrical Safety where required
Trusted by Melbourne home builders
From plans to handover
Every Stage of Your New Home
Here's what happens at each stage of the build, and what you should decide before it.
- 01
Electrical Plan Review Before SlabBefore slab
We go through your plans room by room: power points, lighting, switches, data, TV, CCTV and smart home. Anything under the slab, like a floor power point on an island bench, has to be decided now.
- 02
Rough-InFrame stage
Cables, boxes and conduits go in once the frame is up and before plaster. We mark everything clearly so the plasterers don't cover it, and we work to the builder's schedule.
- 03
Lighting, Data and Smart-Ready WiringDuring rough-in
Data points in every bedroom and the study, a network cabinet, camera locations and smart switch cabling. Done now, it costs little. Done later, it means patching walls.
- 04
Fit-OffAfter painting
Switches, power points, light fittings, exhaust fans, smoke alarms, oven and cooktop are connected, and the switchboard is finished and labelled.
- 05
Certificate of Electrical SafetyBefore handover
Every circuit is tested and the installation is certified. You get the Certificate of Electrical Safety and a walk-through of the switchboard.
Pre-wired before plasterFuture-ready
Lighting, Data and Smart-Ready Wiring
The cheapest time to add almost anything to a home is before the walls are lined.
- Data points in bedrooms, study and living areas, back to one network cabinet
- CCTV cabling to every camera location, ready for wired cameras
- Smart switch wiring so lights and blinds can be automated later
- Lighting plan with downlights, pendants and feature lighting placed for how you'll use each room
- EV charger and solar-ready switchboard space
On time at every stageFor builders
Working With Your Builder
Builders need an electrician who turns up on the day booked, keeps the site clean and doesn't hold up the next trade.
- Locked-in contract pricing for single homes, townhouses and small developments
- Rough-ins and fit-offs booked around your schedule
- Clear communication with your site supervisor and the owner
- Temporary site security cameras available during the build
Before plaster
Upgrades Worth Adding Before Plaster
The builder's standard package covers the basics. These are the upgrades our new home customers most often wish they'd added at rough-in, and the cheapest time to add them is now.
Extra and USB power points
Beside beds, in the kitchen island, in the garage and outside on the alfresco.
Better lighting
More downlights, pendants over the bench, LED strip lighting and garden lighting.
Data and TV points
Wired data to the study, TV and bedrooms, back to one network cabinet.
CCTV cabling
Cable to each camera spot now, even if the cameras go in after you move in.
EV charger circuit
A dedicated circuit to the garage so a charger can go in later without chasing walls.
Split system circuits
Power and pipe routes ready for split systems in each bedroom and the living area.
FAQs
New Home Electrical FAQs
When should I talk to an electrician about my new home?
+
As early as possible, ideally before the slab or before your electrical plan is signed off with the builder. That's when changes cost nothing. Once walls are lined, adding a power point or a data cable costs far more.
What's the difference between rough-in and fit-off?
+
Rough-in is when cables, boxes and conduits go in, after the frame is up and before plaster. Fit-off is after painting, when switches, power points, lights and appliances are connected and everything is tested.
Can you wire my house for data, CCTV and smart home?
+
Yes. We pre-wire data points, TV points, camera locations and smart home cabling during rough-in, so there are no exposed cables or costly add-ons later.
Do you work directly for builders?
+
Yes. We wire homes for builders across Melbourne's west, and we also work for owners who want upgrades on top of their builder's standard package.
Will I get a Certificate of Electrical Safety?
+
Yes. Every new home we wire gets a Certificate of Electrical Safety once the installation is complete and tested, which is required in Victoria.
Can you add things the builder left out after handover?
+
Yes. Extra power points, outdoor lighting, CCTV, ceiling fans and data points are common after-handover jobs. It's easier and cheaper when we planned the wiring at rough-in.
Do you work to the Australian wiring rules?
+
Yes. All of our work is done to AS/NZS 3000, the Australian and New Zealand wiring rules, and tested before handover.
Can you quote from my builder's electrical plan?
+
Yes. Send us the plan and your builder's electrical schedule. We'll price the work, or the upgrades on top of the builder's package, as a locked-in quote.
Keep exploring
Related Services
New home electrical across Melbourne's west. Based in Point Cook and working in Tarneit, Werribee and the rest of Wyndham every week.
Get a quote
Price Your New Home Electrical Package
Send us your plans and we'll come back with a locked-in price, including any upgrades you'd like on top of the builder's standard package.
- Written, itemised quote before any work starts
- Licensed electricians, based in Point Cook
- Certificate of Electrical Safety where required
Want to check us out first? Read about Teksol, our licences and team, or use the contact page to send photos and plans.





